Wall Fixed Cadenza
Installation Instructions:

1. Attach the steel legs to the base of t he instrument with the M8 Nyloc Nuts and 2 part security caps. (1.1) (See Assembly Guide)
2. Attach Wall Fixing posts to legs (1.2) (See Ground Fix Post Installation Sheet)
3. Mark hole locations (X4) using the pre drilled holes in square plate.
4. Drill hole locations (X4) according to your chosen fixings (frame fixings, wall bolts or chemical anchors) depending of the structure of the wall. (Not Supplied)
5. Fix through Plate with suitable fixings (not supplied) in correct orientation and height for intended Key stage. Cover Fixings with 2 Part Caps supplied
6. Attach the 1 pair of beater to the saddle strap on the leg. (1.3)

Instrument Components:

M8 Nyloc Nut x4
M6x20 Security Screw x2
2 Part Cover Cap x4
M6 Saddle Strap x1
Pair Small Red Beaters x1
Wall Fix Components:
2 Part Cover Cap x4
Wall Fixings/Anchors not supplied.
Install Instrument with 1.5m free space (from widest point) around it.

Components List:
2 Part Cover Cap XS
MS Nyloc nut X4
Saddle Strap Xl
M6x20 Pin torx X2