Ground Fixed
Cajón

Components:
M10x150 Threaded barx2
M10 BZP Nutx4

Install Instrument with 1.5m free space (from the widest point) around it.

1. Using M10 nuts and 200mm bolts supplied locate through pre drilled holes and secure bolts in place to support in ground pole in concrete. (See Assembly Guide)
2.Attach Cajon to ground fix plate and leg using M8x25mm security screws provided using thread lock solution not supplied.
3.Excavate a hole for the drum 200mm diameter by 450 deep in desired location upon decision from customer. (See Ground Fix Post Installation)
4. Locate (lower) leg into hole making sure that the cajón is level on ground surface.
5. Once happy with location of the Drum, fill hole using rapid hardening concrete. Be sure to compact concrete around legs and leave to dry according to manufactures guidelines.

Ground Surface
Installation Instructions
Played with hands
22 Kg
400mm Ground Fix
Components:
Weight of heaviest part 18kg
(Cajon Drum)
BS EN 1176
M8x25mm Pin Torx
x8


CAUTION: Drum surface can get hot in direct sunlight, if possible install in shaded areas.
Spares available from percussionplay.com or from your local distributor

Ground Fixed
Cajón
Page 2 of 3
Assembly Guide Cajón
Played with hands
Instrument Components:
M10x150 Threaded barx2
M10 BZP Nutx4
Ground Fix Components:
22 Kg
13.4 Kg
BS EN 1176
M8x25mm Pin Torx x8
M10 Nut X4
M10x200 Threaded Bar X2

COMPONENTS LIST:
M8x25 Pin torx X8
M10 Nut X4
M10x200 Threaded Bar X2

COMPONENTS LIST:
M8x25 Pin torx X8
Thread Lock Solution Required (Not Supplied)
Thread Lock Solution Required (Not Supplied)

CAUTION: Drum surface can get hot in direct sunlight, if possible install in shaded areas.
Spares available from percussionplay.com or from your local distributor