Installation Instructions

Install Instrument with 1.5m free space (from widest point) around it.

1. Attach the steel legs to the base of the instrument with the M8 Nyloc Nuts and 2 part security caps. (1.1) (See Assembly Guide)
2. Attach Ground Fixing posts to legs(1.2) (See Ground Fix Post Installation Sheet)
3. Excavate 2 holes for the Steel legs 250mm diameter by 400-550mm deep depending on Key stage, in desired location upon decision from customer.
4. Locate (lower) legs into holes making sure they are vertical and level prior to concreting in place.
5. Once happy with location of the Instrument, fill holes using rapid hardening concrete. Be sure to compact concrete around legs and leave to dry according to manufactures guidelines.
6. Attach the 1 pair of beaters to the saddle strap on the leg. (1.3)

Instrument Components:

M8 Nyloc Nut x8
M6x20 Security Screw x4
M6 Saddle Strap x2
2 Part Cover Cap x8 M10x200 Bolt x4
M10 Nut x8
Pair Small Red Beaters X2

Spares available from percussionplay.com or from your local distributor

Assembly Guide: Components

2 Part Cover Cap X8
M10 Nut X8
M10x200 Threaded Bar X4
M8 Nyloc Nut x8
Saddle Strap X2
M6x20 Pin torx X4
Ground Fix Post Installation

DUO HD Hole Centres
DUO SD Hole Centres
Black HDPE and Aluminium Body
ABS Painted Body


Ground Fix Post Installation

1. Insert M10x200 Threaded bar into pre drilled holes in Ground Fixing Post.
2. Fix M10x200 Threaded bar in place using M10 Nuts.
3. Excavate 2 holes with 250mm diameter tapering down to 350mm diameter and 450mm depth
4. Compact base of hole with 50mm of aggregate.Lower ground Fix post attached to instrument into hole (check instrument straight and level before filling with concrete).
5. Fix hole with fast drying concrete to manufacturers specifications.

Duplicate points 1-5. Duo requires 2 Ground Fix Posts.