Ground Fixed/Ground Surface
Installation Instructions
M10x200 Boltx2
M10 Nutx4
Ground Fix Components:
Instrument Components:
(1.3) 12.5 Kg

1. Attach Petal Drum section to frame with security screws provided. (1.1) (See Assembly Guide)
2. Attach Ground Fixing studs holes in base of centre post (1.2) (See Ground Fix Post Installation Sheet)
3. Excavate 1 hole for the Steel legs 250mm diameter by 450mm deep in desired location upon decision from customer.
4. Locate (lower) leg into hole, making sure it is vertical and level prior to concreting in place.Install Instrument with 1.5m free space (from widest point) around it.
5. Once happy with location of the Instrument, fill holes using rapid hardening concrete. Be sure to compact concrete around legs and leave to dry according to manufacturers guidelines.
6. Attach the 1 of the beaters to each of the saddle strap on the hex frame. (1.3)

Pair Small Black
Beaters X1
Petal Drum
Page 1 of 3
Weight of heaviest part 7.5kg
BS EN 1176
Metric Conversion:
250mm/ 10”
400mm/ 16”
450mm/ 18”
1080mm/ 42.5”
1.5m/ 59”

Spares available from percussionplay.com or from your local distributor
1080mm
M6x20 Security Screwx4
M6 Saddle Strapx2
COMPONENTS LIST:
M10 Nut X4
M10x200 Threaded Bar X2
Saddle Strap X2
M6x20 Pin torx X4
M8x25 Pin torx X3

Ground Fixed
Assembly Guide PPPETA (1.1)
M10x200 Boltx2
M10 Nutx4

Ground Fix Components:
12.5 Kg
Pair Small Red
Beaters X1
BS EN 1176
Thread Lock Solution Required (Not Supplied)
Thread Lock Solution Required (Not Supplied)

Instrument Components:
TX 30 Driver Bit
x1 Tools:
Spares available from percussionplay.com or from your local distributor

Petal Drum
Page 2 of 3

M6x20 Security Screwx4
M6 Saddle Strapx2
Install 3X PU Inserts into each arm before installing petal section

Insert M10x 150 Threaded bar into pre drilled holes in Ground Fixing Post
Fix M10x 200 Threaded bar in place using M10 Nuts
Excavate 1 holes with a 250mm diameter tapering down to 350mm diameter and 450mm depth
Compact base of hole with 50mm of aggregate.
Lower ground Fix post attached to instrument into hole (check instrument straight and level before filling with concrete)
Fix hole with fast drying concrete to manufacturers specifications.

Aggregate Concrete
Ground Fixed
Components:
Ground Fix Post Installation
M10x200 Boltx2
M10 Nutx4
BS EN 1176

400mm min depth
Metric Conversion:
50mm/ 2”
250mm/ 10”
350mm/ 14”
400mm/ 16”
450mm/ 18”

Petal Drum
Page 3 of 3