Ground Fixed Installation instructions
Harmony Bell
Page 1 of 2
Weight of instrument: 14Kg Weight of heaviest part 8kg (Large Bell)
Instrument Components
Small Beaters x 1
Ground Fix Components:
M10x40 Security Screw x1
M10 Barrel Nut x1
M10x200 Threaded Bar x2
M10 BZP Nut x4

1. Unpack ground fixing leg no.1
2. Lay packaging out on floor or assemble on non-abrasive surface to prevent marking of polished stainless steel.
3. Insert ground fix post (opposite end to polished domes) and secure in place using 1no. M10 x 40mm Screw and Barrel Nut provided. Tools required TX 45 Driver Bits)
4. Insert M10 x 200mm threaded bar and 4no. M10 nuts provided Tools required 2no.17mm metric spanner/ wrench (11/16 inch or alternatively using adjustable wrench)
5. Excavate a hole for the frame 250mm diameter by 450 deep in desired location upon decision from customer. (See Ground Fix Post Installation)
6. Locate (lower) frame into hole making sure that the flowers are level and upright.
7. Once happy with location of the Flowers, fill hole using rapid hardening concrete. Be sure to compact concrete around legs and leave to dry according to manufactures guidelines.
N.B Install instrument with 1.5m free space (from widest point around it)

Metric Conversion: 400mm/ 16” 1650mm/ 64 61/64” 1500mm/ 59 1/16” 1350mm/ 53 5/32” 1.5m/ 59”

Spares available from percussionplay.com or from your local distributor
Made in Britain
BS EN 1176


Ground Fixed Installation instructions
Harmony Bell
Page 2 of 2
Ground Fix Post Installation
1. Insert M10x 200 Threaded bar into pre drilled holes in Ground Fixing Post
2. Fix M10x 200 Threaded bar in place using M10 Nuts
3. Locate the Ground fix Post into the leg of the instrument.
4. Fix instrument to Ground fix post using M10 bolt and Barrel Nut and use thread locking solution to prevent fixings working loose.
5. Excavate 1 hole with a 250mm diameter tapering down to 350mm diameter and 450mm depth
6. Compact base of hole with 50mm of aggregate. Lower ground Fix post attached to instrument into hole (check instrument straight and level before filling with concrete)
7. Fill hole with fast drying concrete to manufacturers specifications.


Foundations should not present a hazard. These foundations are recommended as a guide, for more information on foundation details for various surface see Part 1 of BS EN 1176.

Tools: TX45 Driver Bit x1
Components:
M10x200 Bolt x2
M10 Nut x4
M10 x 40 Secutiry Screw x1
M10 Barrel Nut x1

Thread Lock Solution Required
Metric Conversion: 50mm/ 2” 250mm/ 10”
350mm/ 14” 400mm/ 16” 450mm/ 18”

BS EN1176