Ground Fixed Flat Pack Harmony
Installation Instructions:

1. Unpack frame 3no.
2. Lay packaging out on floor or assemble on non-abrasive surface to prevent marking of polished stainless steel.
3. Align holes on legs (opposite end to polished domes) and secure in place using 3no. M10 x 200mm threaded bar and 6no. M10 nuts provided
Tools required 2no. 17mm metric spanner/wrench (11/16 inch or alternatively using adjustable wrench)
4. Invert assembled frame so domed ends face upwards.
5. Insert M8x60mm Security screws into pre drilled holes in frame using TX40 bit.
6. Attach Notes to Harmony Frame. (See Assembly Guide Sheet)
7. Excavate 1 hole for the Steel leg 250mm diameter by minimum 400mm deep, in desired location upon decision from customer.
8. Locate (lower) legs into hole making sure they are vertical and level prior to concreting in place.
9. Once happy with location of the Instrument, fill hole using rapid hardening concrete. Be sure to compact concrete around legs and leave to dry according to manufactures guidelines.

Can be installed deeper if required
Spares available from percussionplay.com or from your local distributor

Components:

M10 Nut X6
M10x200 Threaded Bar X3
Saddle Strap X3
M6x20 Pin torx X6
M8x60 Pin torx X2
COMPONENTS LIST:
Ground Fixed

Instrument Components:

M6x20 Security Screw x6
M6 Saddle Strap x3
M10x200 Bolt x3
M10 Nut x6
M8x60 Security Screw x2

Ground Fix Components:
Pair Small Red Beaters X1
Harmony Flat Pack x1

Tools:
TX 40 Driver Bit x1
TX 30 Driver Bit x1

Thread Lock Solution Required
CAUTION: Harmony surface can get hot in direct sunlight, if possible install in shaded areas.
Spares available from percussionplay.com or from your local distributor

Assembly Guide: Components List

M10 Nut x6
M10x200 Threaded Bar x3
Saddle Stap x3
M6x20 pin torx x6
M8x60 pin torx x2

1. Excavate a holes with a 250mm diameter tapering down to 350mm diameter and 450mm depth
2. Compact base of hole with 50mm of aggregate. Lower ground Fix post attached to instrument into hole (check instrument straight and level before filling with concrete)
3. Fill hole with fast drying concrete to manufacturers specifications.