Surface Fixed
Installation Instructions Marimba

1. Assemble frame and notes as shown in images 1.2, 1.3 and 1.4 (see Assembly Guide).
2. Attach Surface Fixing Plates to base of each leg using fixings provided (See Surface Fix Post Installation Sheet).
3. Locate Instrument in desired location and mark holes to fix to desired surface.
4. Fix to Surface using recommended ground anchors not supplied.
5. Make sure all fixings are covered and secure using cover caps provided.
6. Beaters can be fixed to frame with fixings provided (1.5)

Surface Fixed
Instrument Components:
M8x60 Security Screw x2
M8 Barrel Nut x4
M8 Square Nut X4
Pair Large Red Beaters X2
Marimba
Page 2 of 2
TX 40 Driver Bit x1
TX 30 Driver Bit x1
Thread Lock Solution Required (not provided)
M6 Saddle Strap x4
M8x60 Pin torx X8
M8 Barrel Nut Pin torx X4
M8 Square nut X4
Saddle Strap X2
M6x20 Pin torx X4
2 Part black cap X8
2 Part Cover Cap

Ground Anchors not supplied
Spares available from percussionplay.com or from your local distributor.

Assembly Guide: Components List

M8x60 Pin torx X8
M8 Barrel Nut Pin torx X4
M8 Square nut X4
Saddle Strap X2
M6x20 Pin torx X4
2 Part black cap X8