Installation Instructions

1. Instrument will arrive on
site fully assembled. (1.1)
(See Assembly Guide)
2. Attach Ground Fixing studs
holes in base of centre pos.t
(1.2) (See Ground Fix Post
Installation Sheet)
3.Excavate 1 hole for the
Steel legs 250mm diameter
by 350mm deep in desired
location upon decision from
customer.
4. Locate (lower) leg into hole,
making sure it is vertical and
level prior to concreting in
place.
5. Once happy with location
of the Instrument, fill holes
using rapid hardening
concrete. Be sure to compact
concrete around legs and
leave to dry according to
manufactures guidelines.
6. Attach the 1 pair of beater
to the saddle strap on each
side of the post. (1.3)

Instrument Components:

M6x20 Security Screw
x4 M6 Saddle Strap
x2 Rainbow Chime Post

Components:
M10 Nut X4
M10x200 Threaded Bar X2
Saddle Strap X2
M6x20 Pin torx X4
M10x200 Bolt x2
M10 Nut x4
Pair Small Red Beaters X1

Tools:
TX 30 Driver Bit x1

Thread Lock Solution Required (Not Supplied)



1. Insert M10x 200 Threaded
bar into pre drilled holes
in Ground Fixing Post
2. Fix M10x 200 Threaded
bar in place using M10 Nuts
3. Excavate a hole with a
250mm diameter tapering
down to 350mm diameter
and 350mm depth
4. Compact base of hole with
50mm of aggregate.
Lower ground Fix post
attached of instrument
into hole (check
instrument straight and
level before filling with
concrete)
5. Fill hole with fast drying
concrete to manufacturers
specifications.