Surface Fixed Pentatonic Tembos
Installation Instructions

1. Locate Tembos frame onto legs and, and bolt into place using pre drilled holes, 2 bolts per post. (See Assembly Guide).
2. Attach Surface Fixing posts to legs (1.2) (See Ground Fix Post Installation Sheet)
3. Locate Instrument in desired location and mark holes to fix to desired surface
4. Fix to Surface using recommended ground anchors not supplied
5. Make sure all fixings are covered and secure using cover caps provided

Instrument Components:

M10x100 Security Screw x14
M10 Flanged Slide Bearing x28
M6 Eye Bolt x2

Surface Fix Components:
M10x70 Security Screw x4
M10 Barrel Nut x4
2 Part Cover Cap x8
Assembly Guide

Main Frame will arrive pre assembled
Thread Lock Solution Required (not supplied)

Components List

M6 Eye Bolt x2
M10x70 Pin torx x4
M10 Barrel nut pin torx x4
M10x100 Pin torx
M10 Black Slide Plastic Bearing x12
SS Brace Bar x1
Surface Fix Post Installation

Locate the Surface fix Plate into the leg of the instrument.
Fix instrument to Surface fix plate using M10 bolt and Barrel Nut and use thread locking solution to prevent fixings working loose.
Fix Surface Plate to the ground surface. Ground Anchors Not provided. Cover fixings with caps provided