Ground Fixed Installation Instructions
1. Attach the steel leg to each of the congas with the M10x50 security screws, square washers and PU mounts. (1.1) (See Assembly Guide)
2. Attach Ground Fixings to legs (1.2) (See Ground Fix Post Installation Sheet)
3. Excavate1 hole for the Steel leg 250mm diameter by 300mm deep, in desired location upon decision from customer.
4. Locate (lower) legs into hole making sure they are vertical and level prior to concreting in place.
5. Once happy with location of the Instrument, fill hole using rapid hardening concrete. Be sure to compact concrete around legs and leave to dry according to manufactures guidelines.

Instrument Components:
M10x50 Security Screwx4
M10x50x3 Square washerx4
M10x200 Bolt
x2 M10 Nut
x4 Ground Fix Components:
PU 200 Mount
PU 250 Mount
x2 x2 Install Instrument with 1.5m free space (from widest point) around it.
1.5m
1.5m
Played with hands
Tumbadoras
Page 1 of 3
Weight of heaviest part 16kg
(Large Djembe Drum)
BS EN 1176
25 Kg

Spares are available from percussionplay.com or from your local distributor
CAUTION: Drum surface can get hot in direct sunlight, if possible install in shaded areas.

PPTUMB PLAN
M10x50 Pin torx X4
M10x50x3 square washer X4
M10 Nut X4
M10x200 Threaded Bar X2
COMPONENTS LIST:
HDPE MOUNT 200 X2
HDPE MOUNT 250 X2
PPTUMB FRONT
Ground Fixed
Instrument Components:
Assembly Guide PPTUMB
(1.1)
Ground Fix Components:
M10x50 Security Screwx4
M10x50x3 Square washerx4
M10x200 Boltx2
M10 Nutx4
PU 200 Mount
PU 250 Mountx2
x2 Played with hands

Tumbadoras
Page 2 of 3
TX 45 Driver Bit
Tools:
x1 BS EN 1176
15 Kg
Spares available from percussionplay.com or from your local distributor

Insert M10x 200 Threaded bar into pre drilled holes in Ground Fixing Post Fix
M10x 200 Threaded bar in place using M10 Nuts
Fill hole with fast drying concrete to manufacturers specifications.

Aggregate Concrete
Excavate a hole with a 250mm diameter tapering down to 350mm diameter and 350mm depth
Compact base of hole with 50mm of aggregate.

Lower ground Fix post attached of instrument into hole (check instrument straight and level before filling with concrete)
Ground Fixed
Components:
Ground Fix Post Installation
M10x200 Bolt
x2 x4 300mm min depth
BS EN 1176
Foundations should not present a hazard. These foundations are recommended as a guide, for more information on foundation details for various surface see Part 1 of BS EN 1176.

Metric Conversion:
50mm/ 2”
250mm/ 10”
350mm/ 14”